Machine
Belt, frame, drive, supports and named transfer hardware, quoted as equipment until the supplier lists extras such as accumulation zones, indexing or a control cabinet.
Delivery
Packing, ocean or domestic freight, duties and insurance to the stated US destination remain separate lines unless the factory writes them into the same total.
Site
Foundations, three-phase supply, compressed air drops, PLC interface work, installation, training and spare parts sit on site-cost lines.